this post is about a paper i made on designing and estimating the components and the various parameters required to set-up a 5KWp Building Integrated Photo-Voltaic Solar power system(grid-tie). I took our college buliding as a location because of simplification of the calculation. I included the detailed report on this paper here.kindly read it and post your feedback.thank you
Follow me on Academia.edu










